Last week Ray’s Flooring changed the flooring in the bathroom and kitchen. We spent almost three hours on Sunday moving everything out of the two rooms. Then we got a call from the installers telling us that it would take two days instead of the one we had thought. I was already off that week so it wasn’t as much of an inconvenience as it might have been.
They came out on Monday and moved the fridge and stove into the living room – not quite where we had planned - so it was a little more cozy for that night. Originally they were going to put a skim coat over the old flooring and then the new flooring over top of that but the old flooring was worse off than they had thought – loose in spots, as well as the holes. So they pulled up the old flooring, removed the baseboards, patched the gaps, and put down two coats of thinset on the Monday.
On Tuesday they added a skim coat of thinset, put in the flooring, swapped out the toilet, put back the baseboards, and ran the flooring down the stairs. The vents Shan had picked up matched the edging on the stairs nicely. They put the stove and fridge back and were done.
We loaded back most of the rest of the stuff. We picked up a pantry unit from Canadian Tire to replace the old shelf unit we were using and the boy and I put it together. Once the roof is fixed, we’ll still need to remove the wallpaper, repaint, and replace the lights.
Subscribe to:
Post Comments (Atom)
No comments:
Post a Comment